    Carpinteria High School

    Installation of Modular Classrooms

    Ready for students after Winter Break in early 2019

    Installation of the five Gen7 science classrooms will begin during the summer. Two additional Gen7 classrooms will be installed behind the “G” wing. The classrooms will provide better indoor air quality, acoustics, thermal comfort and natural light.

    Arrival of Gen 7s

    Gen 7 installation

    Bio lab interior

    Gen 7s in place

    Modernization of Student Restrooms

    Student restrooms in the “G” wing will be modernized.

    Restroom and walkway

    Completed restroom

    Completed restroom

    Roof Replacements for Administration and Cafeteria Buildings

    The roofs of the Administration and Cafeteria Buildings will be replaced for long term cost savings.

    New roof completed

    Replacement of Walkway and Doors for “G” Wing

    Walkways and doors for the “G” wing will be replaced to comply with current accessibility standards.