Project
Carpinteria High School
Installation of Modular Classrooms
Ready for students after Winter Break in early 2019
Installation of the five Gen7 science classrooms will begin during the summer. Two additional Gen7 classrooms will be installed behind the “G” wing. The classrooms will provide better indoor air quality, acoustics, thermal comfort and natural light.

Arrival of Gen 7s

Gen 7 installation

Bio lab interior

Gen 7s in place
Modernization of Student Restrooms
Student restrooms in the “G” wing will be modernized.

Restroom and walkway

Completed restroom

Completed restroom
Roof Replacements for Administration and Cafeteria Buildings
The roofs of the Administration and Cafeteria Buildings will be replaced for long term cost savings.

New roof completed
Replacement of Walkway and Doors for “G” Wing
Walkways and doors for the “G” wing will be replaced to comply with current accessibility standards.