Project
Aliso Elementary School
Front Entrance Gates
New gates will be installed at the main entrance to the school next to the administration building to improve security and enhance the front door of the campus. The new entrance gates will be locked during the school day.
Visitors must first check in at the office and the gate will then be opened remotely from the office to allow entrance to the campus. The gates are designed for compatibility with the circa 1930s building and are manufactured using galvanized steel with powder-coated finish.
Administration Building/Multi-purpose Room Roof Replacement
The existing composition roof will be replaced with Spanish tile to save on energy costs and blend seamlessly with the architectural style of the other classroom buildings.